From time to time we utilize rental heavy equipment, both with and without an operator. Click here for a copy of the bid documents.
From time to time we utilize rental heavy equipment, both with and without an operator. Click here for a copy of the bid documents.
The work consists of cell cross section construction of Cell 9a, on an area owned by the SECCRA, as indicated in the Bid Specification, for the SECCRA Community Landfill.